Jakarta Mass Rapid Rail Transport, Phase 1, CP106
The project comprised the construction of two underground stations, Bunderan HI and Dukuh Atas, together with more than 8km of associated tunnelling. Diaphragm walls were installed to form the station boxes followed by excavation and construction of the slabs from roof slab downwards as excavation progresses.
For entrance and ventilation shafts, a cast in-situ reinforced concrete was used as the permanent structure. Entrances and ventilation shafts were constructed using bottom up construction method and steel struts and walers used to prop open the excavation. Tunnelling was carried out using Earth-Pressure-Balance (EPB) Tunnel Boring Machines (TBM).
Project Summary
- Name
- Jakarta Mass Rapid Rail Transport, Phase 1, CP106
- Location
- Indonesia
- Date
- 2015-17
- Client
- PT Mass Rapid Transit Jakarta
- Contractor
- SMCC-HK JV
- Instrumentation Specialist
- PT Sarana Jaya
- Consultant
- CECI
Monitoring
Monitoring included: Soldier piles Inclinometer casing behind soldier piles for manual inclinometer surveys and monitor ground deflections. Internal struts VW Strain gauges were installed on the internal struts to monitor strain. D-Walls VW Sister Bar strain gauges were installed in the steel cages. Line of tunnel Automatic VW Borehole Rod Extensometers and manual Magnetic Extensometers to monitor settlements. VW piezometers to monitor pore water pressures. Tunnel segment Lining Total Pressure cells to monitor external pressures Data acquisition Multi-sensor stand-alone loggers together with manual readouts.