Menu
Metro tunnel post construction

Tunnels and Metros

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.

Bucharest Metro Line 5
Tunnels and Metros

Bucharest Metro Line 5

Romania

Bucharest has four metro lines (Metro Lines 1, 2, 3 and 4) consisting of 70km of double track, 49 stations and four depots. The network handles about 600,000 pa...

Find Out More
Jakarta Mass Rapid Rail Transport, Phase 1, CP104/5
Tunnels and Metros

Jakarta Mass Rapid Rail Transport, Phase 1, CP104/5

Indonesia

The CP104 and CP105 construction sections include a total of 3.89 kms of 6.05m twin tube tunnelling, four underground stations – Senayan, Istora, Bendunga...

Find Out More
Jakarta Mass Rapid Rail Transport, Phase 1, CP106
Tunnels and Metros

Jakarta Mass Rapid Rail Transport, Phase 1, CP106

Indonesia

The project comprised the construction of two underground stations, Bunderan HI and Dukuh Atas, together with more than 8km of associated tunnelling. Diaphragm ...

Find Out More
Nordhavn Metro
Tunnels and Metros

Nordhavn Metro

Denmark

The Nordhavn metro is a dual track metro branching off from the Cityringen subway. The project comprises two tunnels of up to 1.8 km in length, an emergency ven...

Find Out More
Crossrail C310: Thames Tunnel
Tunnels and Metros

Crossrail C310: Thames Tunnel

UK

Following the successful Channel Tunnel Rail Link contract, joint venture partners HOCHTIEF Solutions AG and Murphy & Sons Limited were awarded the C310 pr...

Find Out More